Aerial view of Mina María at Cehegín, Spain

EUROCORE MINERALS · CEHEGÍN, SPAIN

European iron ore.
A defined path back to production.

EuroCore is advancing a brownfield magnetite project in Spain built around established mining rights, historical production, ~65% Fe concentrate and Mediterranean access to European steelmakers.

Explore Mina María
SPAINMurcia · European Union
61 CONCESSIONS979 ha · valid to 2069
~65% Feconcentrate pathway
120,000 wmt/ypermitted concentrate output
~115 kmto Cartagena deep-sea port

THE INVESTMENT CASE

Near-term restart potential.
District-scale optionality.

EuroCore’s proposition begins with a real brownfield asset and expands into a larger historic iron-mining district.

01European iron ore

Magnetite project in Murcia, Spain, positioned inside the European steel market.

02Fully permitted mining rights

61 exploitation concessions covering 979 ha, valid to March 2069.

03~65% Fe concentrate

Historical production and metallurgical testwork support a high-grade concentrate pathway.

04Historic producer

4 Mt of ore was historically mined and processed to high-grade concentrate before operations stopped in 1990.

05Defined restart path

Stage 1 targets 120,000 wmt/y of 65% Fe concentrate and restart within 12 months of financing.

06District upside

Four deposits, 40,000+ metres drilled and a staged plan to expand beyond Mina María.

EUROPE'S IRON ORE GAP

Europe is changing how it makes steel.
Not eliminating its need for primary iron.

Europe remains structurally dependent on imported iron ore even as steelmaking shifts toward greater scrap use and DRI-EAF capacity.

77%

EU iron-ore import reliance

2024 · JRC-RMIS
82 Mt

iron ore imports

2022 EU steel mass flow
38 Mt

EU iron ore production

2022 EU steel mass flow
2022 EU STEEL MASS FLOW · SIMPLIFIED
82 MtIRON ORE IMPORTS
71.4 MtIRON INTO STEEL
137.7 MtCARBON STEEL
+
75.2 Mt scrap into steel
EUROCORE'S POSITION
~65% Fe CONCENTRATEEuropean primary iron input
EU STEEL CAPACITY 58% BF-BOF today
2035 ESTIMATE 32% BF-BOF
2035 ESTIMATE 18% DRI-EAF
2035 ESTIMATE 50% scrap-EAF

Source: European Commission Joint Research Centre, Analysis of the EU Steel supply chain: current trends and circularity opportunities, JRC142660 (2025). 2022 mass-flow figures and 2024 import-reliance assessment are shown with their respective reference years.

MINA MARÍA · NEAR-TERM ASSET

This is not a greenfield discovery.

Mina María is a historic open-pit magnetite mine with established mining rights, documented production, technical work and an updated restart package.

4 Mtore historically mined and processed before 1990
37,875 mhistorical drilling · 1,243 holes
120,000 wmt/ypermitted Fe concentrate output at Mina María

Historical production and drilling figures are archival project records. Historical resource estimates are not current mineral resources or reserves.

Historic Mina María open pit
Mina María during historical operations · project archive

PERMITTING

Fully permitted mining rights.

Designed to make the legal and administrative position easy to verify rather than burying it in marketing language.

61 exploitation concessions979 ha · valid until March 2069
Mining permit + plan120,000 wmt/y concentrate capacity
EnvironmentalEnvironmental study approved by Spanish authorities
Waste managementExisting waste areas permitted

Restart remains subject to customary pre-production implementation steps, financing and execution of the current development plan.

PATH TO PRODUCTION

What is done. What remains.

Mining rights61 concessions · 979 ha
Mine permit + plan120 kt/y concentrate
Environment + wasteApproved / permitted
Stage 1 worksGrid · dewatering · river · solar
FinancingCurrent development gate
RestartConstruction + commissioning
ProductionTarget operating state
~12 MONTHStarget from financing to production, subject to engineering, procurement and final pre-production requirements.

FROM MINA MARÍA TO CEHEGÍN

Mina María establishes the operation.
Cehegín provides the scale.

Cehegín comprises four principal deposits across 61 exploitation concessions. Historical drilling totals 37,875 m in 1,243 holes, supplemented by 3,276.75 m in 24 holes drilled in 2021–2022. The wider potential remains exploration upside—not a current reserve.

MINA MARÍA · 0.9 Mt HIST.COLOSO · 4.5 Mt HIST.SOLEDAD · 2.0 Mt HIST.VILLAMEJOR25–35 Mt CONCEPTUAL POTENTIAL · MICON 2023
INVESTOR DISCIPLINE Current project ≠ district potential.

The 7.4 Mt historical estimate, 2015 aeromagnetic potential and Micon 2023 conceptual potential are different evidence classes and are presented separately.

PROJECT ARCHIVE · PHYSICAL EVIDENCE

Decades of work.
Visible in the record.

Original mine photography, 1981 workings plans, drilling records and historical concentrate analyses provide a documentary bridge between the former operation and today’s restart plan.

Historical Mina María mine and processing plant
Historical Mina María operation and plant
1981 Mina María old workings topography and drill locations
1981 workings / drilling archive
Mina María geological profile
Historical geological profile

THE PRODUCT

~65% Fe concentrate.
Simple physical beneficiation.

Historical production and metallurgical testwork support conventional crushing, grinding and magnetic separation.

HISTORICAL AVERAGE CONCENTRATE65.15% Fe

Recorded for historical Mina María concentrate production.

01ROM ore
02Crush + grind
03Magnetic separation
04Concentrate

EUROPEAN ADVANTAGE

Mine → Cartagena → European steel.

Location is treated as a commercial variable: logistics, supply-chain exposure and delivered carbon—not as a slogan.

~115 kmto Cartagena deep-sea port via established road infrastructure
SHIP-READYconcentrate delivered to Cartagena; pelletizing and steelmaking remain customer operations
EU MARKETEuropean production positioned closer to European steelmaking demand

DELIVERED CARBON

One comparison.
Methodology behind it.

Current preliminary engineering model: approximately 17 kg CO₂e/t concentrate FOB Cartagena. Delivered comparisons use common destination assumptions.

≈33
≈34–35
≈46–47

kg CO₂e/t concentrate · preliminary modeled comparison. Benchmark boundaries require harmonisation before permanent public use.

EUROPEAN. INDUSTRIAL. DISCIPLINED.

Better ore. Lower delivered carbon.
Stronger European steel.